Tunnelling Systems and Equipment
Orion selects P2 Mining for early works trial at South African mine
Orion updated the mineral reserve estimate within the +105 Level Crown Pillar to 2.3 million tonnes at 1.7% copper and 1.6% zinc.
Orion updated the mineral reserve estimate within the +105 Level Crown Pillar to 2.3 million tonnes at 1.7% copper and 1.6% zinc.