Mipac Commissioning and Accelerated Startup: A Controlled Path from Construction to Reliable Production
Start-up is where a project’s value is protected or lost. When commissioning falters, the plant pays for it in delays and downtime, and the ramp-up to steady production stretches out while the owner waits for a return on investment.
Mipac supports mineral processing plants from first start-up through to ongoing optimisation. The aim is simple: a smooth handover from construction to operation, with a plant that runs safely and reliably from day one.
What does commissioning and accelerated startup involve?
Commissioning proves that the plant, its control system and the people running it are ready to work together. Mipac’s scope can cover an entire process control system or a single plant component, depending on what the project needs.
What’s included
- Rigorous testing of control systems and plant components before and during start-up
- Operator training, so the team running the plant understands the system they are handed
- Proactive troubleshooting to find and fix issues before they turn into downtime
- Commissioning of complete process control systems or individual components
- Ongoing support and optimisation once the plant is running
Why it matters: A problem found during testing is far cheaper to fix than one found after ore is in the circuit.
Two ways to engage
Every project is structured differently, so Mipac’s commissioning team can step in where it fits best.
Engagement options
- Project management lead: Mipac leads the commissioning effort and coordinates the work through to handover
- Commissioning contractor: Mipac delivers the commissioning element within a wider project
Why it matters: Owners can bring in commissioning capability that suits the way their project is already set up.
Operational experience, not just a checklist
A commissioning checklist can confirm that a loop responds to a test signal. It can’t tell you whether that loop will hold up under real ore, real variability and a real shift crew. For almost 30 years, Mipac has worked in mineral processing, across more than 730 projects in 55 countries.
What this means in practice
- Control strategies tested against how the plant will actually be operated
- Operators trained on the system they will use from the first shift
- Issues traced across process, control and electrical systems, not passed between disciplines
- A handover your operations and maintenance teams can run and maintain
Why it matters: The knowledge built during commissioning stays with the site team instead of leaving with the commissioning crew.
Commissioning on site: three projects
Three plants show what this looks like in practice, from a new copper concentrator in Peru to two Queensland start-ups.
Case studies
- Quellaveco concentrator, Anglo American, Peru. Mipac supported the start-up of the new copper concentrator from May 2022, covering PCS7 control strategy configuration, training and 24/7 control system support. Both concentrator lines reached full capacity in October 2022. Read the case study
- Dugald River concentrator, MMG, Queensland. Plantwide Schneider M580 and Wonderware control system configuration, HMI design and commissioning, from the crushers through to the thickeners and filters. First production came ahead of schedule, with a smooth move from commissioning into operational support. Read the case study
- Ernest Henry Mine, Queensland. Design, configuration and commissioning of the plantwide Yokogawa control system for the $310M greenfield copper and gold mine and concentrator. The plant made a rapid start-up to nameplate capacity, with very stable process control. Read the case study
Why it matters: A start-up ahead of schedule at Dugald River and a rapid ramp to nameplate at Ernest Henry are what accelerated startup looks like on a real plant.
When to bring in commissioning support
Commissioning support is worth planning early for new plants, expansions and brownfield control system upgrades, as well as for the replacement of individual plant components. The earlier commissioning is part of the plan, the fewer surprises there are at start-up.
Ready to plan your start-up?
Book a discovery call with one of Mipac’s commissioning experts to talk through your project and where support would make the biggest difference.