Projects

Donkin Coal Project, Nova Scotia

The Donkin coal project is an underground mine located on the north-eastern tip of Cape-Breton, Nova Scotia.

Producer of
Coal
Location
Nova Scotia, Canada
Mine Type
Underground
Reserves
58Mt
Production Started
February 2017
Owner/operator
Kameron Collieries

The Donkin coal project is an underground mine located on the north-eastern tip of Cape-Breton, Nova Scotia. Kameron Collieries (Kameron), an affiliate of the Cline Group, is the owner and operator of the coal mine.

Kameron acquired a 75% interest in the project from Glencore in December 2014 and in January 2015, it purchased the remaining 25% interest from Morien Resources for $5.5m under a definitive purchase and sale agreement.

Production from the first continuous miner at Donkin commenced in February 2017, while the coal handling, preparation and processing plant (CHPP) was installed in September 2017.

With an estimated mine life of more than 30 years, the project is anticipated to produce 3.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal and 2.75Mt of saleable coal.

The mine is expected to create 135 full-time jobs at full production.

Donkin coal project geology

The project is situated approximately 28.5km east of Sydney in Cape Breton, which falls within the Sydney Coalfield of Nova Scotia.

“The project is anticipated to produce 3.5 million tonnes per annum (Mtpa) of run-of-mine (ROM) coal and 2.75Mt of saleable coal.”

A large coal basin of Carboniferous age, the coalfield extends towards north and northeast from the northern part of Cape Breton Island under the Atlantic Ocean towards Newfoundland. The landward portion of the coalfield comprises less than 5% of the total coal measure sequence.

The mine is classified as a low-type A structural complexity. The resource block extends over an area of approximately 100,000ha.

The Donkin area hosts up to 11 coal seams, of which three seams, namely Lloyd Cove; Hub; and Harbour, have the potential for underground mining.

Donkin coal mine reserves

Coal at the Donkin project is regarded as high-quality metallurgical coal (low-ash, high-energy thermal coal).

The coal mine is estimated to have probable mineable reserves of 58Mt. The indicated and inferred coal resources are estimated to be 483Mt.

Construction

Kameron completed the dewatering of two 3.6km-long access tunnels to the mine’s Harbour coal seam in the second quarter of 2015. Access to the Hub seam will be provided by constructing two slopes between the Harbour and Hub seams.

Construction of a new warehouse was completed in the second quarter of 2016, while tunnel refurbishment works and additional underground assessment drilling were also completed during the same year.

Production is expected to start from the two dual coal sections in 2018 and the annual production is estimated to be less than 1Mt.

Coal mining at Donkin

Room-and-pillar (board-and-pillar) mining method with partial pillar extraction using four continuous miners is applied to extract coal from Donkin.

The main development area of the Harbour seam is located along the strike of the seam and runs from east and west of the access tunnels. The secondary or production panels will be driven downwards to a depth of 600m.

Kameron proposed to develop a new mine plan for Donkin by introducing new equipment, which is yet to receive approval from the Nova Scotia provincial government.

Ore processing

The CHPP comprises a raw coal stockpile reclaim system incorporating three coal feeders onto a reclaim conveyor located in a tunnel, a two-stage reduction crushing station, a plant feed system, and dry disposal reject handling system.

The processing plant operates at 650tph and features a single-stage, large diameter, dense medium cyclone to process coal, spirals to process the mid-size material, and flotation to beneficiate the fine coal.

Coal produced at Donkin is stockpiled on-site before transporting as well as stockpiled at the Provincial Energy Ventures port in Cape Breton. It is planned to be exported to the Atlantic basin market and Asia.

Infrastructure facilities at Donkin

Power supply for the mine will be provided by a new 69kV electrical line from the town of Glace Bay to the newly constructed electrical sub-station at the project.

Access to the mine site is through a 1km-long all-weather gravel road that connects to the paved roads that extend to Sydney.

Other existing infrastructure includes a metal storage building currently being utilised as an office, storage, and maintenance facility.

The project also includes the construction of a barge-loading facility to enable transhipment of coal.

Royalty and milestone payments

Morien will receive a gross production royalty of 2% on the first 500,000t of coal sales per quarter and 4% on any coal sales above 500,000t throughout the project’s mine life, as per the definitive purchase and sale agreement signed with Kameron.

Kameron made one milestone payment of $2m to Morien in February 2015 and a second milestone payment of $2m in February 2017.

Morien is also entitled to receive an additional $1.5m on the first commercial sale of export coal from Donkin and on the third anniversary of the transaction closure on 27 February 2018.

Related Projects

Odysseus Project

The Odysseus project is a long-life, low-cost nickel sulphide redevelopment project in Western Australia. Discovered in 2010, Odysseus is among…

Isaac Downs Project, Queensland

Isaac Downs project is a new open-cut metallurgical coal mine being developed in Queensland, Australia. The mine is a part…

Zgounder Silver Mine Expansion

The Zgounder silver mine is the second most significant silver mine in Morocco after Managem's Imiter silver mine. It is…

Fosterville Gold Mine, Bendigo

The Fosterville mine is a high-grade, low-cost underground gold mine located in Victoria, Australia. It is 100% owned by Canadian…