Canadian mineral explorer Salazar Resources has released results of the preliminary economic assessment (PEA) at its El Domo project in Ecuador.

The PEA report prepared by Buenaventura Ingenieros in Peru, noted that total waste production for open pit was 46.22Mt and mining strip ratio was 7.44.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

As per the assessment, total open pit production that is factored in for mining extraction and mining dilution was 6.21Mt (79% indicated and 21% inferred resources) at 2.06% copper, 2.98% zinc, 0.39% lead, 2.90g per tonne of gold and 57g per tonne of silver.

"The high-grade feed in the early years of the open pit operation is expected to achieve a payback period of two years."

Total underground production that is factored for mining extraction and mining dilution was 1.75Mt (35% indicated and 65% inferred resources) at 2.10% copper, 1.39% zinc, 0.08% lead, 1.09g per tonne of gold and 31g per tonne of silver.

As per the PEA, the 14-year mine life was split into nine years for open pit at 2,000t a day and five years for underground mining at 1,000t a day. Pre-operational CAPEX was $110.28m, which includes studies, mine equipment, pre-stripping, processing plant, tailing reservoir, waste dump, power supply and ancillary services.

Price assumptions as per the PEA are $3.06 per pound of copper, $0.86 per pound of zinc, $0.95 per pound of lead, $1,200 per ounce of gold and $20 per ounce of silver.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

After-tax internal rate of return is 30%, and net present value is $86.72m at a 10% discount rate. Net after-tax cashflow is $202.58m.

The PEA report studied several alternative sites for waste dump, tailings reservoir, processing plant and ancillary facilities, which identified the most likely sources for process-water and electricity.

Salazar Resources CEO Fredy Salazar said that the results of the PEA show positive economics to proceed to the pre-feasibility stage in the incoming months.

"The high-grade feed in the early years of the open pit operation is expected to achieve a payback period of two years, an IRR of 30% and a NPV of $86.72m, while at the same time generate a cashflow for further exploration and discoveries in the district," Salazar said.

Energy

Mining Technology Excellence Awards - Nominations Closed

Nominations are now closed for the Mining Technology Excellence Awards. A big thanks to all the organisations that entered – your response has been outstanding, showcasing exceptional innovation, leadership, and impact

Excellence in Action
Recognised with the Research & Development Award , Nokia’s Cognitive Digital Mine uses AI, IoT and digital twin technology to deliver predictive, self-optimising mining operations. Learn how Nokia’s Digital Twin Black Box is enabling safer, more efficient and more profitable mines worldwide.

Discover the Impact