BHP Coal Mine – Mount Owen – New South Wales Australia

A unique cantilevered stacker supplies dewatered coal products to a 300,000t stockpile. From this, coal is loaded into unit trains at a rate of 4,000t/h using a specially designed, automated batch weighing system that gives an accuracy of 0.05% per wagon.