The world’s largest – and Australia’s first – magnetite iron ore mine and processing facility couldn’t fire up its own power station until thorough load testing had occurred. And for load testing, the mine needed loadbanks.

Knowing that we could bring in equipment from all around the country, CITIC Pacific Mining called us in to help. As well as load testing their 450MW combined-cycle gas-fired power station, they also needed back-up power to keep construction moving along.