Contura Coal West, based in the Powder River Basin (western US), needed additional machines but did not have the capital budget to invest in new equipment. Contura did, however, have two idled shovels in the eastern US it could relocate. To meet production requirements, these machines had to be moved, reassembled, upgraded and operational within eight months.
We partnered with Contura through a lifecycle management (LCM) agreement to relocate and rebuild the two shovels in a timely, cost-effective manner.
Please download this free white paper to read more.