Ore processing will be carried out at a rate of 6mtpa.
-
The Tropicana gold project is located in Western Australia on the edge of the... -
Feasibility study on the project will be completed by the end of 2010. -
Ore samples. -
The Tropicana Mine deposit extends over a strike length of 4km. -
The deposit will be mined using open pit methods. -
Traditional drill and blast, truck and excavator operations will be used. -
Ore processing will be carried out at a rate of 6mtpa.