A twin-boom Tamrock development jumbo, used for sinking the main access declines and for opening up the new stoping areas.
-
A twin-boom Tamrock development jumbo, used for sinking the main access... -
The declines from the Loraine shaft infrastructure have been equipped with... -
A schematic layout, showing how Target is being developed from the old... -
Harmony is continuing with its surface exploration drilling programme to the... -
One of the mine’s Tamrock Solo long-hole drill rigs, used for bulk mining of... -
The underground crusher station, commissioned in 2000, crushed run-of-mine...