Home > Industry Projects > Africa and the Middle East > Target Gold Mine
Specifications - Target Gold Mine, South Africa
| Key Data |
| Producer of | Gold |
| Location | Between Welkom and Bothaville, Free State province, South Africa |
| Ownership | Harmony Gold Mining Co. (100%) |
| Geology type | Precambrian metamorphosed palaeo-placer quartz-pebble conglomerate reef horizons |
| Mineral type | Native gold plus silver |
| Reserve base | 18.1Mt containing 3.8Moz of gold (proven and |
| Annual production | 350,000oz/y planned over at least 15 years’ mine life |
| Mining method | Underground trackless mining, including long-hole open stoping, cut-and-fill and drift-and-fill; conventional narrow-stope de-stressing before bulk mining |
| Processing method | Primary crushing underground, followed by SAG milling, centrifugal gravity concentration, cyanide leaching, carbon-in-pulp adsorption, elution and electrowinning to produce doré bars for refining |
| Employment | 1,000 |
| Key Equipment |
| Underground | Sandvik development drilling jumbos
|
| | Sandvik Solo long-hole drilling rigs |
| | Sandvik load-haul-dump machines |
| | Walter-Becker materials transport monorails |
| | Decline conveyor system |
| | Hitachi refrigeration plant |
| | Prostar communications and mine control system |
| Concentrator | Nordberg underground crushers |
| | Svedala SAG mills |
| | Anglo American Research Laboratories gold electrowinning system |
| Featured Suppliers |
| Dust-A-Side - Dust Control Management for the Mining Industry |
| Gekko - Gravity Separation and Mineral Processing Equipment |
| REMA TIP TOP - Conveyor Belt Maintenance, Wear and Corrosion Protection |
| Voith Turbo - Start-Up Components |