Ore production from the open pit has been built up to 40,000tpm, with a pit life of some 14 months.
-
Blasted stope ore is scraped down to mucking bays in the reef drives and... -
The processing plant is a standard UG2 plant incorporating milling and... -
The plant has been designed to produce about 95,000oz of 4E PGMs per year. -
Ore production from the open pit has been built up to 40,000tpm, with a pit...