The trial pit used to obtain bulk samples for process testwork in 1996.
-
The trial pit used to obtain bulk samples for process testwork in 1996. -
The refinery complex. -
Grade control sampling in the open pit. -
Ore mining during the pre-production phase. -
Transporting one of the autoclaves to the mine site. -
View through the giant fans at the Murrin Murrin power station. -
Acid leach autoclave with the slurry heating tower behind.