Hartley plant flowsheet. The plant currently has a capacity of 180,000t of ore per month.
-
Hartley has an integrated processing plant, consisting of a mill,... -
The Great Dyke location map. The initial operation has been designed to... -
Schematic of the underground access system. The dip and narrowness of the... -
Drilling in a production stope underground at Hartley Platinum. -
Hartley plant flowsheet. The plant currently has a capacity of 180,000t of... -
Pouring matte from the smelter at Hartley Platinum. Final matte contains 44%...