Existing infrastructure at the site includes two shaft headframes and four hoists, fans, compressors, generators and underground equipment, as well as the necessary surface freehold required to operate the mine.
-
The project is a conventional underground mine with breasting of Upper and... -
The project lies in the Witwatersrand Basin, an Archean sedimentary basin. -
Existing infrastructure at the site includes two shaft headframes and four...