The Elandsrand project has required an entirely new mine to be equipped beneath the existing infrastructure which has been operating continuously, seven-days-a-week throughout.


Back to Project Details

cachename:Projectscachekey:rd287061489_631011743_rd221744618_1841472618_rd-1665407042_-1874280820_rd-488908060_-173330816_