Cannington Silver and Lead Mine

The hoisting shaft head frame. The excavation method involves stripping out a 1.8m-diameter raise drilled pilot hole and installing a concrete lining working down from the surface.

The hoisting shaft head frame. The excavation method involves stripping out a 1.8m-diameter raise drilled pilot hole and installing a concrete lining working down from the surface.


client logon
Home
Products & Services
Company A-Z
White Papers
Special Reports
Industry News
Advertise With Us
Jobs & Careers
Events & Exhibitions
Newsletter
New On This Site
About Us
Atom FeedRSS Feed
What is RSS?