Concrete Actiflo® Clarifiers for Precipitation and Separation of Heavy Metals in Tailings Water


Date
30 May 2008

Abstract

The Cochenour Wilanour property is located about 8km from the Red Lake Mine. In the past, water was batch treated for arsenic contamination and this was achieved through the addition of ferric sulphate to ponds of standing water within the tailings. The mine was being managed as a zero discharge site while plans for a water treatment facility were being developed to meet or exceed environmental requirements for closure.

To improve upon the application of ferric sulphate direct to the ponds Goldcorp had decided that high rate liquid / solids separation utilising established chemistries be adopted. With only a very small area available in an existing building it was decided that 2 x 4,000m³/d concrete Actiflo® clarifers would be installed for the precipitation and separation of arsenic and other heavy metals out of the tailings water. The Actiflo® water clarifcation technology relies on microsand to significantly increase the settling velocity of particles. This results in outstanding process performance and very small equipment footprint.

Please download this free white paper to find out more.




Home
New On This Site
Products & Services
Company A-Z
Industry Projects
Special Reports
White Papers
Jobs & Careers
Industry News
Events & Exhibitions
Newsletter Archive
Newsletter Sign Up
Advertise With Us
About Us
Client Area


RSS What is RSS
The website for the mining, tunnelling and quarrying industries