DRA Mineral Projects

Mining, Infrastructure and Mineral Processing Projects

The Pilanesberg Platinum Mines project with a design capacity of 365,000tpm features a design which treats two reefs separately: UG2 at 65,000tpm and the Merensky at 300,000tpm.

Back to Company Details