DRA Mineral Projects Mining, Infrastructure and Mineral Processing Projects

The DRA Group, a multi-disciplinary, multi-national enterprise, specialises in a total solutions offering covering virtually every aspect of mine design, infrastructure and mineral process plant design and construction. It has seven offices located in mining areas around the world and plants on five continents.

Click here to find out more.

Mining project management, infrastructure and civil engineering

DRA Mining provides a total mining solution which includes: consulting services, exploration management, geology, studies, Competent Person reports, resource modeling, mine design, mine scheduling, surface and underground infrastructure, design and engineering, materials handling, construction management, operational support, maintenance and mine closure.

This service, which covers the entire spectrum of industrial, civil and structural design and construction, is managed by a specialist engineering and construction team.

Minerals processing plant design

DRA Mineral Projects has been successfully involved in some of the most challenging mine and processing developments in the world. The company has the expertise to conceptualise and design mineral processing plants from run-of-mine ore to saleable product in the platinum, coal, diamond, gold, ferrous and base metals, uranium and phosphate sectors, amongst others.

Project management for mineral processing plants

DRA’s project management capabilities ensure total control across all types of projects. By drawing on its collective expertise, the company is able to direct the entire project process from conceptual feasibility to final hand-over and beyond. DRA offers fast track implementation when required, testing and inspection, construction management and control as well as office and conference facilities for sites in remote areas.

Contract operations and winder engineering

Minopex, one of the companies within the DRA Group, is a specialist in the field of contract operations and maintenance of metal and mineral processing facilities in the coal, platinum and diamond industries.

Whether acting as consultant, project manager or principle contractor, DRA Technical Services (DRATS) is equally comfortable providing independent, specialist expertise in new winder projects, winder refurbishment and upgrades, training or software engineering. The division also offers a full shaft and shaft steelwork design capability.

Electrical, instrumentation and control of mineral plant projects

As a leading, independent and self-sufficient electrical, energy management, control and instrumentation engineering solutions provider to industry and mining, DRA can provide clients with high and medium voltage heavy current, low voltage and light current electrical designs; instrumentation design; and sophisticated software programming and data communications. Its specialist power engineering division can analyse, upgrade and optimise power systems on mining and large industrial sites in order to reduce energy bills, optimise processes and manage energy consumption.

Mineral plant safety

DRA is recognised as a leader in the field of safety and has taken this a step further with the introduction of people-based safety, a ‘beyond zero’ process that strives for a total safety culture by making the workplace people-driven rather than behaviour-driven.

Make an enquiry

Follow this company

Follow the company to be always up to date with this company

Press Release

Hansen Transmissions to Publish Results

Hansen Transmissions International NV (LSE ticker "HSN") will publish its results for the three months ended 30 September 2009 and for the six months ended 30 September 2009 on Monday 26 October 2009 at 7.15am UK time. For more than 85 years Belgium-based Hansen Transmissions has worked

Address
DRA Mineral Projects

DRA House

No. 3 Inyanga Close

Sunninghill

2157

Other

South Africa

+27 11 202 8600 +27 11 202 8807/8 www.DRAinternational.com www.minopex.co.za

DRA Mineral Projects Images

Products and Services

Video

White Papers

Press Release

10 April 2011

Industrial gearbox specialist Hansen Industrial Transmissions (HIT), formerly in hands of Hansen Transmissions International (HTI), and acquired by Sumitomo Heavy Industries (SHI) in March 2011, is ready to move forward under its new ownership. In combination with its extended product portfolio f

Read more
4 April 2011

Industrial gearbox specialist Hansen Industrial Transmissions (HIT), formerly in hands of Hansen Transmissions International (HTI), and acquired by Sumitomo Heavy Industries (SHI) in March 2011, is ready to move forward under its new ownership. In combination with its extended product portfolio f

Read more
31 May 2010

Hansen Transmissions International has announced that the notice to the Special Shareholders' Meeting, to be held on 24 June 2010 in Edegem, Belgium, has been published today and is now available on the Hansen website. Copies of the notice, together with the proxy form, have been subm

Read more
17 May 2010

Hansen Transmissions International NV ("Hansen", "the Group" or "the Company", LSE ticker 'HSN') has announced its results for the three months ending 31 March 2010 and for the 12 months ending 31 March 2010. Highlights of the 2010 financial year include: Revenue decl

Read more
10 May 2010

Hansen Transmissions International, an established global wind turbine gearbox and industrial gearbox designer, manufacturer and supplier, with a leading position (by MW supplied) in the wind turbine gearbox market, will publish its results for the three months ended 31 March 2010 and for the f

Read more
18 March 2010

The board of Hansen Transmissions International is pleased to announce, with effect from 31 March 2010, the appointment of Alex De Ryck as chief executive officer (CEO) following the decision by Ivan Brems to retire from active executive duties as CEO of the company. Alex De Ryck curr

Read more
27 January 2010

Hansen Transmissions International (Hansen) today announced its interim management statement for the third quarter, which ended on 31 December 2009. The financial information reported in this release is presented in euro and has been prepared in accordance with the recognition and measurement cri

Read more
19 January 2010

Since early 2009, the volatility and challenges impacting the near term wind market have been reflected in Hansen Transmissions International’s financial results, most recently in the half-year interim results where we commented on our caution resulting from the operating environment remaining ch

Read more
18 November 2009

Hansen Transmissions International NV (Hansen) notes the announcement made today by AE Rotor Holding (AERH), a wholly owned indirect subsidiary of Suzlon Energy (Suzlon), regarding the secondary placing of 236 million depository interests in Hansen (the “Placing”). As a result of the P

Read more
27 October 2009

Edegem, Belgium and London, UK - Hansen Transmissions International ('Hansen', 'the group' or 'the company', LSE ticker 'HSN') has announced its results for the three months ending on 30 September 2009 and for the six months ending on 30 September 2009. Highlights of results fo

Read more
19 October 2009

Hansen Transmissions International NV (LSE ticker "HSN") will publish its results for the three months ended 30 September 2009 and for the six months ended 30 September 2009 on Monday 26 October 2009 at 7.15am UK time. For more than 85 years Belgium-based Hansen Transmissions has worked

Read more
29 July 2009

Hansen Transmissions International NV ("Hansen", "the Group" or "the Company") yesterday announced its Interim management statement for the 3 months ended 30 June 2009. Highlights Q1 2010 Revenue €136 million compared to €139 million for the same period

Read more
25 June 2009

At the annual shareholders meeting held on 25 June, the resolution to appoint John Deutch as the second (non-executive) nominee director of Hansen Transmissions International NV was passed. Mr Deutch is an institute professor at Massachusetts Institute of Technology, where he has been

Read more
27 May 2009

Hansen Transmissions International has announced that the following documents have been published today and are now available on the Hansen website: Annual financial report 2009, for the financial year ending 31 March 2009, at http://www.hansentransmissions.com/en/reports_publicat

Read more
16 April 2009

Hansen Transmissions Industrial has extended its product portfolio of industrial gearboxes with the Hansen M-Series, a complementary range that caters for optimised application requirements that are integrated into the design phase and result in a reliable and functional gear drive solution.

Read more
16 April 2009

Hansen will be exhibiting at Hanover Fair 2009, which takes place Hanover, Germany, on 20-24 April 2009. The display of Hansen Transmissions' industrial business activity at the Hanover Fair 2009 consists of Hansen P4 gearboxes, Hansen M4-ACC gearboxes for air cooled condensers, Hansen

Read more
22 March 2009

Hansen Transmissions International, an established global gearbox designer, manufacturer and supplier with a leading position in the wind turbine gearbox market, has announced that it has delivered the first gearbox from its new facility at the Beichen Hi-tech Industrial Park in Tianjin. <

Read more
1 October 2008

The Kroondal platinum group metal (PGM) mine, located 120km northwest of Johannesburg on the Western Limb of the Bushveld Complex, was Aquarius Platinum’s first operation. It commenced production in 1999 and remains the company’s flagship project. It is also mining contractor Murray &am

Read more
22 October 2007

Murray & Roberts Cementation is playing a key role in the Bankable Feasibility Study (BFS) for Wesizwe Platinum Limited's proposed Frischgewaagd-Ledig Project in the Pilanesberg. "We have entered into a Memorandum of Understanding with Wesizwe in this regard," Mike Wells, Murray & Roberts

Read more
22 October 2007

The Eastern Limb of the Bushveld Complex, centred around the towns of Steelpoort and Burgersfort in Mpumalanga in South Africa is undergoing a boom, with some 18 mines in existence and more in the offing. Located in this area is the Dwarsrivier Mine, in operation since 2000, and which three and a

Read more
7 September 2007

The financial year ended June 2007 was good for Murray & Roberts Cementation, with the company reporting revenue growth of approximately 20% over the previous year. However, profitability was lower than expected, primarily due to the unprotected industrial action experienced during the second

Read more
21 August 2007

Murray & Roberts Cementation's contract to deepen the sub shaft at Gold Fields' Driefontein Number 9 shaft showcases the company's full service offering. What it offers the mining industry encompasses far more than the company's extensive range of contracting services. One of the de

Read more
21 August 2007

Murray & Roberts Cementation is pioneering new drilling technology at Anglo Platinum's R2-billion PaardeKraal 2 (PK2) shaft near Rustenburg, which forms part of its Rustenburg Platinum Mines (RPM) operation. The main sink on the ventilation shaft commenced end May, while collar con

Read more
9 July 2007

Murray & Roberts has formed a joint venture with Hochtief of Germany and Jäger Bau GmbH in preparation for the tender for the main underground works for Eskom's Ingula (formerly Braamhoek) Pumped Storage Scheme (PSS) about 60km outside Ladysmith in KwaZulu-Natal. The tender for the five-

Read more
8 June 2007

Raise-drilling and shaft-boring technology and services supplier, Murray & Roberts Cementation, has been contracted to a number of Anglo Platinum (Angloplats) projects, including the platinum major's Townlands Ore Replacement Project (TORP) and Paardekraal's 1 and 2 shafts. The con

Read more
8 June 2007

Underground mining contracting has always been the lifeblood of international mining contractor Murray & Roberts. "The nature of mining contracting work necessitates a support infrastructure for plant and associated ancillary equipment," says Murray & Roberts engineering se

Read more
8 May 2007

In a new approach to tackling the skills shortage, Murray & Roberts Cementation is investing in increased capacity at its training centre to allow for greater numbers of students as well as exposure to the true mine environment. Full scale mock ups of shafts, tunneling and production areas, w

Read more
8 May 2007

Mock-ups and computer-aided training to enhance productivity and ensure safety Additional shaft mock-ups, a multimedia education centre, and two new mining equipment simulators are planned for the Murray & Roberts Cementation Training Academy at its premises in Bentley Park near the

Read more
15 March 2007

Aquarius Platinum’s Marikana Platinum Mine has extended its trial mining contract, originally awarded in 2005, with Murray & Roberts Cementation at its No 1 Shaft and newly planned No 2 Shaft. The estimated annual revenue from the project is R45 million and the project will, at steady state,

Read more
15 March 2007

Murray & Roberts Cementation recently completed the contract to construct two water retaining bulkhead plugs underground on 27 Level at Kloof No 10 shaft. A remarkable aspect of the contract was the fact that two teams of women not only operated the batch plant, but were directly i

Read more
1 February 2007

Ventilation underground is a critical constituent of mining, and the construction of a new ventilation shaft can be extremely complex. Murray & Roberts Cementation is completing a massive ventilation shaft installation project for Aquarius Platinum. The entire project consists of t

Read more
1 February 2007

The successful construction of a four-pump grout plant at Anglo Platinum Ltd's RPM Union Section by Murray & Roberts Cementation will meet the ongoing support needs for production on the mine's decline section. Murray & Roberts Cementation was awarded the contract in January 20

Read more

Regional Offices

DRA Mineral Projects

DRA House

No. 3 Inyanga Close

Sunninghill

2157

Other

South Africa

+27 11 202 8600 +27 11 202 8807/8 www.DRAinternational.com www.minopex.co.za
DRA Mineral Projects

Perth

Other

Australia

DRA Mineral Projects

Other

Canada

+1 705 652 3729

Contact company

I have read and accept the terms and conditions and privacy policy.
We'd like to keep you informed about relevant promotions, products and services, if you would like not to receive these, check this box.
If you would like to hear from carefully selected third party companies, check this box
Follow this company to receive notifications when they update.