SimMine® is an independent provider of simulation products for the mining industry. Building on our extensive experience in simulation and program development, we have specialized in providing simulation products for the mining industry.
SimMine is a business improvement tool for the mining industry. By using SimMine as the method for verification, you will get far more accurate results than with common spreadsheet based programs. SimMine can be used both for existing and future mines.
The SimMine product family consists of many different simulation products, all designed to help mining companies make more correct choices when it comes to decision making.
Make the most out of your assets by using SimMine for optimized resource planning and scheduling of underground development. SimMine can help you assure that your development project is completed on time and within budget.
The SimMine development package is easy-to-use and powerful software to plan, simulate and evaluate the development process in underground mining. SimMine can be used both for existing and future mines.
The SimMine development package contains:
The SimMine development package improves development processes by allowing the user to:
A mine's infrastructure changes over time as development advances. It is difficult to predict the long-term logistical consequences of decisions made today. By simulating different long-term plans, the best strategy can be chosen for each unique situation. The mine's engineers can use simulations to test a plan's strengths and weaknesses in order to evaluate the likelihood of achieving the set goals.
By using simulation software, every aspect of a proposed change can be analysed without investing resources on implementation. This is crucial, because, when the decision has been made, the concrete is in place, or the transport system is completed, changes or additions are very costly.
Simulation can be used to specify requirements for the design of a system. For example, the specific requirements for a machine in a complex production environment might not be known. By simulating different performance levels for the machine, the requirement level can be set.
Bottlenecks in production are a headache in the industry. It’s easy to forget that bottlenecks are an effect, rather than a cause.
One of the advantages of simulation is that policies, control criteria, procedures and methods can be analysed when a valid model has been set up without disrupting the actual system. Changes can be introduced in the model, and the effects happen on the computer, instead of in the actual system.
Diagnose problems
The modern mine is so complex that it is impossible to evaluate all of the relationships that exist. Simulation gives better understanding of relationships between various resources in the system.
SimMine AB
Torget 1
SE-930 70 Malå
Sweden
Tel: +46 70 688 01 20
Email:
patrik@simmine.com
URL:
www.simmine.com