Namspace specialises in the design, manufacture and erection of prefabricated (modular) structures in Namibia and the rest of Africa.
Our extensive experience in the planning, design and erection of prefabricated camps in the sectors of mining, construction, military, police, education, and health services has enabled us to offer professional turnkey projects throughout Africa.
Prefabricated modular buildings
The stigma of quick, cheap, hot and dusty, that was attached to the old prefabricated buildings, was well deserved. Namspace has taken prefabricated modular buildings to the next level. These new buildings are dust free, well insulated and will last for 30 years plus if maintained. Buildings can be moved to new locations with ease, thus saving time and money. The majority of our permanent and mobile buildings are built to suit clients' specific needs. Our product range includes:
Long-lasting mine-camp modular buildings
We specialise in:
Our services include:
Namspace Contractors was established by Gavin Hanssen in 2006 with the start of the Langer Heinrich Uranium Project in the Namib Desert.
Namspace now has close to 100 employees and has been involved in numerous large-scale projects in Namibia and other African countries, including:
Modular office blocks, accommodation units, cafeterias and ablution facilities
Trekkopje Areva Uranium Project: Erection of more than 60 buildings during the past 24 months. These include offices, laboratories, en-suite accommodation, cafeterias, and ablution facilities. More than 40 MODS have been supplied to site for accommodation, offices and ablution blocks. Fire proof panels were developed for control rooms.
Ruacana Construction Camp in conjunction with Murray & Roberts and Nampower: Erection of a 400-man construction camp in four months, including all buildings, fencing, plumbing and electrical work.
Langer Heinrich Uranium (LHU) Project Phase 1: Building of a camp for 550 construction workers. This camp was dismantled, packed and transported to northern Malawi. Construction of all the LHU permanent buildings, for example, the administration block, laboratory, ablution facility and the final product recovery internals was also undertaken. In addition five substations were erected and clad.
Langer Heinrich Phase 2: Construction of a new 400m² production office, a 200-man ablution facility, tea rooms and engineering planning offices. All new control rooms were clad with insulated panels for dust proofing and insulation.
Malawi - Kayelekera: Erection of LHU construction camp, including accommodation units, kitchens, diners, ablution facilities, freezer and cool rooms.
Mobile mine-camp and office units
Langer Heinrich Phase 3: Supply of mobile office units, ablution blocks and stores for LHU, Murray & Roberts and Grinaker LTA.
State House, Government of Namibia: Erection of permanent camps on various sites in Namibia for protection services.
Rossing Uranium (Rio Tinto): Supply of mobile units for the new Acid Leach Pad Project.
Modular border posts
Namibian Police Force: Erection of permanent border posts on the northern borders of Namibia and supply of mobile units for security.
Namspace Contractors CC
74 Tannenhof
Swakop River Plots
Swakopmund
Namibia
Tel: +264 64 405460
Tel: +264 81 124 1489 (mobile)
Fax: +264 64 400995
Email:
info@namspace.net
URL:
www.namspace.net