Boltstress Performs Weldless Installation of Globe Valve Using Quickflange
Boltstress has performed the weldless installation of a 2in globe valve using Quickflange. The process was comprised of: Pre-installation Pipe cutting Pipe...
Boltstress Eliminates Liner Bolt Failures Again
Another Western Australian mine site that experienced high levels of breakdowns, typically one every week, now goes from shutdown to shutdown with no failures. This is the third site in the...
Boltstress Ultrasonics Supplies Drive Pad Bolting for Tailings Thickener
Boltstress Ultrasonics was asked by the operator of a tailings thickener to provide a reliable joint and to establish an in situ monitoring system to prevent future failures on the...
Boltstress Complete Structural Fastener Work on World's Largest Ball Mill
Boltstress Ultrasonics Service Division has completed the Ultrasonic Monitoring & Torque Tightening of the structural fasteners on the worlds largest Ball Mills in less than five shifts...